![]() Colliers provided all project management services throughout the project including turnover, closeout, commissioning, and State audit compliance. Orchard Hill Elementary: Construction of the new 75,600 gsf Orchard Hill Elementary School was completed in 2017. The project is anticipated to be completed in August 2020. The new school will house grades K-5 and be designed for a 390 student enrollment with a building area of 60,700 square feet. However, the school operations will be moved to the old Orchard Hill Elementary School. Smith Elementary School: The school, which was originally constructed in 1959, will be replaced with a new structure on the existing site. The project is anticipated to be completed by Fall 2020. ![]() The existing school will be vacated, abated, and demolished after the new school is completed and occupied. The new school will house grades K-5 and be designed for a 437 student enrollment with a building area of 66,586 square feet. Projects that Colliers has served as owner’s project manager for South Windsor Public Schools include:Įli Terry Elementary School: The school, which was built in 1965, will be replaced with a new structure on the existing site while the school remains in operation. By working with the State of Connecticut, Office of School Construction Grants & Review, Colliers positioned South Windsor to minimize their risks in the ever-changing environment in Connecticut. Smith Elementary School to determine if the District needed to move forward with the construction of new elementary schools, renovate-as-new, or extension and alteration. The Town of South Windsor overwhelmingly passed the referendum by a 4 to 1 margin to construct two new elementary schools.Ĭolliers assisted the District in the evaluation of the Eli Terry Elementary School and Philip R. Colliers presented the project to the various Town Boards as well as several Town Public Information Sessions. In addition, Colliers was part of the project team to educate the community on the technical details of the project. ![]() During the Pre-Referendum part of Phase 2 of the Master Plan, Colliers provided services including budget and schedule development, consultant coordination, educational specification coordination, and due diligence. Colliers Project Leaders is providing project management services for many South Windsor Public School projects as part of the District’s 10-year, 3-phase Master Plan. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |